Click to Enlarge
<<
Back to Thermal List
|
Mini steam power plant
- BSPIL-THR-20021-20026
This State of Art Comprehensive Steam Lab comes as a package;
AIM:- Performance Test & Energy Balance test on Steam Boiler; Steam Turbine test rig.
Rankine Blade :- Thermal Efficiency on Turbine
Steam Boiler :- Non IBR 12 Kg/sq m
Pressure :- Fully automated, Oil fired comes with all safety devices.
Water Softner :- Iron exchange type with first fill of resin & comes with ½ HP Single phase self priming Mono block pump.
Fuel Tank :- 100 ltrs capacity comes with valve, stand, piezometer, pipes & lid for closure.
Boiler Controller :- Control Panel with switches, gauges & meters.
Steam Turbine :- Rankine Blade, Impulse Turbine
Turbine Control Panel :- Comes with Digital Panel Meter
Surface Condenser :- Shell & Tube type with 2 nos. water & 1 no. Steam pass.
Cooling Water :- 2 HP Centrifugal Pump 3 phase is provided for the auangent
Vacuum Creation in Condenser :- 1 HP Reciprocating pump with 2880 rpm is provided to extract
condensate from condenser and this create vacuum.
Control Valves :- To make Turbine Experiment either with or without condenser.
Steam Flow meter :- Steam Flow meter is provided with due calibration of Orifice condenser pots, valves, mercury manometer tubes etc.
Separating & Throttling Calorimeter :- Comes with calibrated Orifice Condenser pots, valves, mercury, Manometer tubes etc.,
Steam Piping :- Complete conveying pipes, valves, flanges to connect boiler to various parameters.
Insulation for Steam lines :- Done with glass wool & Aluminum sheathed Cladding.
*** Please refer the Institution scope while placing order. ***
WORK FROM INSTITUTION: (Cost of Borne by College)
Though cost of the college, we can however supervise work
a. Foundations, platforms, pits, trenches and other civil works.
b. Over head tanks, sump etc.,
c. Electrical wiring from and up to our equipment.
d. Water Piping from and to our equipments with fittings.
Detailed drawings for all above will be provided once order is confirmed.
Utilities required from college:
a. Water for testing and running.
b. LDO (Diesel) about 400 liters (if the Diesel is additionally required the college should provide it) for setting, installation and demonstration.
c. ELECTRICAL POINTS: 3 phase and single-phase AC power supply.
d. Unloading of all equipments to the lab.
e. Shifting of all equipments to the lab.
f. Welding and machining facilities
g. Plumbing work facilities.
h. Work assistance during installation.
Models:
BOILER CAPACITY BOILER MAKE MODEL NO. CAPACITY OF TURBINE
200 Kg/hr Thermax BSPIL-THR-20021 0.75 KW 12 to 15 kg
200 kg/hr Pyromatic BSPIL-THR-20022 0.75 KW 12 to 15 kg
400 kg/hr Thermax BSPIL-THR-20023 1 KW 15 kg
400 kg/hr Pyromatic BSPIL-THR-20024 1 KW 15 kg
600 kg/hr Pyromatic BSPIL-THR-20025 2 KW 15 kg
800 kg/hr Pyromatic BSPIL-THR-20025A 2 KW 20 kg |